Perbandingan Kinerja Lalu Lintas Tanpa dan Dengan Aktivitas Putar Balik pada Jalan M T Haryono di Depan Bank BCA Kota Kendari
Abstract
This study compares traffic performance under conditions without and with U-turn activity on M T Haryono Street, in front of Bank BCA to Lippo Plaza, Kendari City. Field surveys provided traffic and road geometry data, and performance was evaluated using PKJI 2023 as applied in the source manuscript. Traffic volumes without and with U-turn activity were 3986.1 and 4440.6 pcu/h, respectively, with the same road capacity of 5814 pcu/h. The source summary reports an increase in the degree of saturation from 0.69 to 0.76 and a change in level of service from C to D. Average passenger-car speed decreased from 44 to 41 km/h, travel time increased from 16.36 to 17.56 seconds, and delay increased from 7.728 to 12.540 seconds/pcu. The comparison descriptively indicates poorer traffic performance under the condition with U-turn activity. The source calculation table reports saturation values of 0.44 and 0.51; these values are retained with a note explaining their difference from the summary.
Downloads
Copyright (c) 2026 Irwan Lakawa, Hado Hasina, Laode Muhammad Fahrizal Ahsan; Pirjal Alamsyah

This work is licensed under a Creative Commons Attribution 4.0 International License.




















