Analisis Ketersediaan dan Kebutuhan Air Baku serta Neraca Air Kecamatan Rumbia Kabupaten Bombana dengan Metode FJ Mock
Abstract
This study estimates raw water availability, projects domestic and non-domestic water demand, and assesses the water balance in Rumbia District, Bombana Regency, for 2026–2035. Monthly streamflow was simulated using the FJ Mock rainfall–runoff model with 2015–2025 hydroclimatic inputs from the Rumbia Sub-Watershed. A geometric population projection was used to estimate demand. Under the thesis supply scenario, cumulative availability reached 82,309,264 m³, while demand totaled 10,315,028 m³, comprising 9,321,644 m³ of domestic demand and 993,384 m³ of non-domestic demand. The resulting cumulative surplus was 71,994,236 m³. The smallest monthly surplus in 2026 occurred in August, at 502,724 m³. The projected surplus is conditional on the supply assumptions. The reported 80% dependable flow and the monthly supply volumes require reconciliation before the estimates are used for intake design.
Downloads
Copyright (c) 2026 Andi Makkawaru Isazarny Jassin, Vickky Anggara Ilham, Annisa Puji Lestari Thahir; Muhammad Aslan

This work is licensed under a Creative Commons Attribution 4.0 International License.




















